IndRebuild Logo
factory
factory color

Maintenance and repair

Heavy Mining Machinery Component Repair and Services

Repair Service

Repair Service

  • Perform routine maintenance and complete overhaul on diesel engines from Caterpillar, Komatsu, Cummins, and Perkins.
  • Perform routine maintenance and complete overhaul on Caterpillar brand power transmission components.
  • Perform routine and components rebuild on all types of hydraulic piston pumps for equipment and machinery of brands such as Caterpillar, Komatsu, Hitachi, and Liebherr.
* Transmissions, Torque Converters, Differentials, Final Drives & Wheel GP
Repair Service

Warranty Period

  • A 12-month or 6,000 engine hour warranty is provided when components rebuild are performed on machinery and equipment components.
Service Duration

Service Duration

Estimated duration: 7–28 days, depending on component size, spare parts availability, and other factors.

Repair and service work process:

Repair and service work process:

  • Receiving and documenting aggregate components
  • Component pre-disassembly washing (with documentation)
  • Disassembly of components with documentation
  • Detailed cleaning of components after disassembly (with documentation)
  • Comprehensive inspection and diagnostic assessment of components (documented)
  • Component disassembly report (teardown report)
  • Component repair quotation and cost estimate
  • Component assembly (documented)
  • Component coating and painting (documented)
  • Final inspection of components
  • Component delivery and handover (documented)
  • After installation of the components on the machine/equipment, we perform on-site start-up, testing, and handover (documented).
Repair and Service work process:

Repair and Service work process:

  • Our warranty service team comprises 8 engineers and technical staff, supported by 6 off-road vehicles (1 LC76, 1 LC200, and 4 LC300), fully equipped with service tools and maintained in a state of readiness.
  • Upon receipt of a warranty service request, we ensure the readiness of the required personnel and spare parts and deploy them to the mine site within 24 hours.